Kitchen renovations in Bentleigh, specified before they are built

BENCHTOP

20 mm stone, mitred to a 40 mm edge

WHERE THE BUDGET GOES

Material choices set the budget. Style follows.

A kitchen is decided by a short list of calls: how the carcass is built, what the door front is made of, which benchtop you can live with, and how the splashback meets the bench. Those decisions are written down first, line by line, so the quote describes a specification you can read instead of a picture you liked.

THE SLAB ABOVE

Veining runs one way. Plan the joins for it.

Slab selection, edge profile and the position of the sink cut-out are settled at the design stage, not on installation day. The same discipline applies behind the doors.

CARCASS

16 mm board, moisture-resistant under sinks

The box does the structural work. Edging on every exposed face is what keeps it square and clean after a decade of steam.

DOOR FRONT

Two-pack, laminate, melamine or timber veneer

Fronts carry the look and most of the cost difference. Matte finishes hide cutlery marks; gloss shows every fingerprint near the sink.

HARDWARE

Soft-close runners, adjustable hinges, full extension

The part of a kitchen you touch most and see least. Drawer weight rating and extension decide how the deep pot drawers behave.

Flat pale timber panel showing natural horizontal wood grain and knots.

DOOR

Timber veneer

Grain direction is a decision. Run it vertically on tall units and horizontally across a bank of drawers.

Close-up of small pastel and neutral tiles arranged in overlapping rows with visible texture and grout lines.

SPLASHBACK

Tile, set out to a grid

Set-out starts at the cooktop centreline so cut tiles land in the corners, not behind the tap.

Warm timber cabinet doors with dark vertical pull handles, strongly lit from the side.

HANDLE

Pull or finger groove

Handleless fronts read calmer but need a rail detail and tighter tolerances at every join.

Open light-oak kitchen drawer containing plates, bowls, cups, and organized compartments.

STORAGE

Drawers over doors

Deep drawers reach the back of a base cabinet. Doors ask you to kneel. Plan the split before cabinetry is cut.

The twelve-line schedule

Strip-out to handover under one scope

Measure, plan, elevations, specification

Built to the wall, not to a catalogue

Galley, unit and cottage floor plans

Handleless fronts, matte and satin finishes

Stone, veneer and butler’s pantry detail

Engineered, natural, porcelain, timber, laminate

Slab, tile or glass, full height or set

Clearances, overhang, services and storage

Walk-in, butler’s, drawer systems, corners

Cabinetry, trades, template and fit-off

Same layout, new fronts, tops and handles

Every line above is a scope you can ask about on its own. Some kitchens need the whole schedule; others need one row replaced. Tell us which lines matter and the quote is written against those, with the rest left out.

OUR 12-STEP RENOVATION PROCESS

Twelve stages, in the order they happen

Each stage has a decision attached to it. Selections close before demolition starts, which is what keeps a kitchen moving once the old one is out.

01   Consultation

02   Measure

03   Design

04   Quote

05   Material selection

06   Demolition

07   Cabinetry

08   Plumbing & electrical

09   Benchtops & splashback

10   Installation

11   Finishing

12   Handover

Kitchen guides

Planning-stage reading written for people still deciding on layout and materials. Each guide points to the service page that carries the detail.

Scope, cabinetry construction, benchtop material and moving services — the four things that move a figure.

Galley, L-shape, U-shape and island plans, with the clearances each one needs to work.

How engineered stone, natural stone, porcelain, timber and laminate behave under heat, stains and daily use.

Drawer systems, pantry types and the corner and overhead space most plans waste.

Stage durations mapped against the twelve steps, and the selections that usually cause delays.

ASKED BEFORE ANYTHING IS DRAWN

Four questions that come up first

Can we keep the existing layout?

Often, yes. Where the carcasses are sound and the plumbing stays where it is, a makeover replaces the doors, benchtop, splashback and handles without moving a wall.

Does everything have to be selected before demolition?

Material selection closes at stage five for a reason: cabinetry is cut and stone is templated against decisions already fixed. A late change reopens an earlier stage.

Can one line be quoted on its own?

Yes. A benchtop, a splashback or a storage run can be scoped apart from a full renovation, and the quote is written against only the lines you ask about.

What happens while the kitchen is out?

The old kitchen leaves at demolition, so a temporary sink, fridge and bench are worth arranging before strip-out week. The renovation checklist sets out what to organise.

KITCHEN STYLES

Five directions, written as specification

A style name is a set of decisions — front type, handle, benchtop and finish — rather than a look bought whole.

Flat fronts, rail or finger pull, matte and satin finishes

Slab benchtops, veneer joinery, butler’s pantry detail

Classic shaker — profiled door, painted finish, visible handle: a cabinetry decision before a style one.

Hamptons-influenced — shaker fronts with pale stone and a tiled splashback.

Warm minimal — timber veneer against plain stone, read against what ages well in design trends.

What a project record will contain

Projects are documented to a fixed structure so one kitchen can be compared with another: suburb, property type, client brief, before and after, layout, cabinetry, benchtops, materials, design solution and final result. Records are published as work is documented — nothing stands in for them in the meantime.

PRIMARY AREA

Bentleigh, Victoria

ALSO SERVING

Bentleigh East, Brighton East, Hampton East, Moorabbin, McKinnon, Ormond and nearby suburbs

Much of the local housing stock is inter-war and post-war, which means non-square walls and undersized service runs. Cabinetry is measured on site rather than assumed from a plan.

Tell us what the kitchen has to do

Send the room, the scope and the lines from the schedule you care about. You get a written response about layout and materials before any figure is discussed.

THE FORM ASKS FOR

Name, email, phone and location

SCOPE

Subject, budget and timeframe

DETAIL

Project details, in your own words

Describe the room, the scope you want priced and the corner that fails you now. If photographs would help, we ask for them in the reply once your enquiry arrives.