An older traditional kitchen with dark wooden cabinets, tiled backsplash, countertop appliances, a dining table, and a floral tablecloth.

Reference image: an existing kitchen, where every quotation starts.

Home / On-site Kitchen Assessment / Your Written Quotation

Process · Step two

The quote comes after the look, not before.

A kitchen renovation quote is only as useful as the inspection behind it. Ivan Bodnar is an independent home renovation specialist with approximately 15 years’ hands-on residential renovation experience. He visits your Bentleigh kitchen and looks at what is already there before writing anything down. The on-site assessment is free, and so is the written quotation that follows it.

or call 0413 142 055

1

First discussion

You explain how the kitchen needs to work and what bothers you about it now, such as storage, bench space, worn surfaces or an awkward layout. You talk to Ivan directly.

2

On-site assessment

Ivan inspects the existing condition and considers layout, cabinetry, finishes and services. He checks what new finishes would sit on. Read more about the on-site kitchen assessment.

3

Written quotation

Ivan prepares the scope in writing from what he saw and what you discussed together. It is free, and it is never prepared before the assessment.

4

Your questions

You read it at your own pace and ask about anything that is unclear. Practical options can be compared before you decide whether to go ahead.

Keep or replace

What the quotation is built from

A written quotation sets out what Ivan saw on site. It is not a price taken from a list. Two kitchens that look alike in photos can need quite different work once the cabinets, walls and floor have been checked.

Layout
Whether the existing layout can stay, or whether a change would make the kitchen more practical to use and clean.

Cabinetry
Which carcasses are sound enough to reuse and which need replacing. More on this in what to keep or replace.

Finishes and suitable materials
Benchtops, splashback, flooring and wall finishes, chosen to suit the room and the way you use it.

Surface preparation
What the new finishes will sit on, including moisture, substrate suitability and visible damage. See why surface preparation comes first.

Services
Where plumbing or electrical changes are part of the plan and need licensed trades.

Kitchen questions

“When can I receive a written quote?”

After the on-site assessment. That is the only firm answer, because the quotation depends on what the assessment finds.

A straightforward refresh with a kept layout and reused cabinets is simpler to scope than a kitchen where the layout changes and plumbing or power has to move. If licensed trades are needed, their part of the work has to be considered too. Ivan will tell you during the visit if anything needs a closer look before the quotation can be written.

Photos sent beforehand can help with the first discussion, but they do not replace the assessment. Other common questions are answered on Kitchen Renovation Questions.

Repair

What the quote can’t see

An inspection cannot reveal every concealed issue. Moisture damage behind a cabinet, a wall that is out of true or ageing services can stay hidden until the old kitchen comes out.

If something like this turns up, it may affect the scope. Ivan will explain what he has found and the practical options, and you will be kept informed before the work changes. No quotation can rule out variations, but a careful assessment reduces surprises.

Read what may be found behind kitchen cabinets.

An unfinished interior with tiled wall sections, exposed electrical wiring, unfinished plasterwork, a ladder and construction materials.

Reference image: exposed wiring and unfinished plaster during a kitchen strip-out.

LICENSED TRADE

Contracts, insurance and licensed work

Ivan is an independent sole trader and does not personally claim unverified trade licences or builder registration. Licensed plumbing and electrical work is carried out by appropriately authorised specialists, and the quotation shows where that work fits into the scope.

Contract, insurance and approvals wording is checked for each project rather than copied from a template, because scope, permits, registration, insurance and licensed trade requirements vary from one kitchen to the next. More on plumbing, electrical and licensed trades.

Before the assessment visit

☐  Note what works in the kitchen now and what doesn’t

☐  Decide what you would like to keep, if anything

☐  Mark any leaks, soft spots or damage you have noticed

☐  Clear access under the sink and into the main cabinets