Handleless fronts, matte finishes and integrated appliances read as a style. They are really a tolerance question. With nothing to grip, every gap between doors becomes part of the design, and the whole run has to be set out so shadow lines carry true across drawers, appliance panels and end returns. That setting-out happens on a measured drawing, before any cabinetry is ordered.
Three details do most of the work in a contemporary kitchen. Each one has a cost consequence worth knowing before it is drawn.
Stages three and five decide the face: gap sizes, pull type and finish are fixed on the drawing and in the material schedule, well before demolition starts.
Send the room dimensions and the look you are after, and the reply comes back as a schedule: door, pull, finish, benchtop, splashback and the stages that follow.