A complete renovation is the only scope where the layout is genuinely open. Once the old kitchen is out, the sink, the power, the gas and often the wall line can all move — which is why the specification, not the style, sets the budget.
Two kitchens drawn to look identical can differ by an entire trade if one of them shifts the plumbing three metres. So the schedule is written first: carcass, door, benchtop, splashback, edge profile, handle. The photograph follows the schedule, not the other way around.
Replacing doors and a benchtop over the existing footprint is a makeover. A complete renovation starts the moment something moves — and moving things is what pulls in the other trades.
In older brick homes around Bentleigh, Ormond and McKinnon, the wall between kitchen and dining is sometimes load-bearing; opening it needs an engineer’s detail before any cabinetry is drawn. Keeping the wall and re-planning within it is often the better answer, and that call is made at the design stage rather than on site.
The same twelve stages run on every complete renovation. Selections close before demolition, because the cabinetry is manufactured to the drawing and the benchtop is templated to what is actually installed.